Thanks, Mr Mayor. I'm in the same position as the Deputy Mayor in that I can't support this unless there's either the inclusion of the existing point four in the recommendation, which I think can probably coexist to a degree with the current point three, or that point three is replaced with the point four from the recommendation in the business paper. Staff have flagged that we need further expertise. We as a council are very well intended here, but— After four and a half years on the Floodplain Risk Management Committee, this is feeling like a bad case of déjà vu. We have been over so many of these issues so many times and made recommendations to Council and to the State Government, and we are still in exactly the same position.
And now we have this really clear focus because we've had the disaster that we were getting ready for. And I think if you look at page 16 of the report, you can see clearly the benefits of bringing in a working group that has sufficient expertise to carry some of these things forward. It's not a reflection on the capacity of this Council. It's a reflection on the capacity of the people that we had involved in the Floodplain Risk Management Committee that had a depth of understanding and experience and, in many cases, a corporate knowledge and history of the floodplains that we, as a group of councillors, can't match. And the added value from that input, given freely, was really, really valuable.
I would urge councillors to consider bringing those people back on board with a working group. They are already skilled up. They are used to functioning within a committee capacity. They know where Council is on these because they've been involved in these discussions for four and a half years. They are, for example, familiar with the Resilient Valleys program. They are familiar with our discussions around infrastructure limitations on the floodplain. We don't need to do anything to get them up to speed. They are already there. So I would urge you to revert to the previous point four that recommends the formation of the working group. It doesn't preclude this committee continuing to provide advice for Council's grant-funded floodplain management projects.
That's our job as councillors. But there is an additional level of expertise that we would be remiss to ignore. So I would urge you to put that point four back in. If the mover of the motion isn't keen on that, then I will move an amendment that adds that point four. Further to that, further to the current motion, Richmond Bridge, the Community Advisory Group, which included two members from the Floodplain Risk Management Committee, recommended strenuously that increased flood proofing be included with that bridge. We were certainly cognisant that anything that would get passed a one in a hundred or even a one in fifty would require really significant increases to the embankments required to get roads up to height.
But we were told that the purpose of the project was never to provide a flood solution and that it would never go beyond a one in twenty solution. Now, if Council wants to advocate more strongly, I think that would be excellent. But we need to be— look, maybe having this flood will make Infrastructure New South Wales and Transport for New South Wales keener on a flood solution, but I'm not hopeful. They certainly were quite dismissive of the need for it previously. In part because of the massively increased cost that it would involve. I refute the idea that electricity is not problematic west of the river. We were incredibly lucky. The information that we have from Infrastructure New South Wales, and this has been discussed at length by the floodplain risk management committee, was that electricity provision west of the river, and in fact to the whole LGA, becomes incredibly problematic after the river height reaches 14.6 metres.
That was something that was—14 metres was floated with this flood. Above 14, 14.5 metres, you're looking at the failure of the substation that provides power to most of the LGA. That is a devastating impact and would have lasting devastating impacts on the LGA. We had some areas here that had no electricity for up to a week. So areas around Grono Point, for example, in Wilberforce, had their power turned off because it was running through floodwaters, and that's something we need to look at. We've got houses that probably could have had the power on had their wires come in a different direction. So neighbouring properties that were wired from the road above them stayed on. Properties that were wired from an area below the level of the road lost their power because their power went underwater.
That's something that perhaps we can look at changing and getting some grant funding in to change to keep those people connected. But provision of electricity is a real issue for us.